Heavy freight and project logistics for contractors, building material suppliers, and construction equipment dealers managing job site delivery and project timing.
Oversized and overweight loads requiring permits and escorts
Job site delivery with limited access and tight delivery windows
Project-based shipping with variable volume and timing
Heavy equipment requiring specialized flatbed/lowboy capacity
Last-minute changes and project delays affecting freight schedules
Access to flatbed, step-deck, lowboy, and heavy-haul carriers with permit expertise for oversize/overweight loads.
Experienced drivers familiar with construction site access, safety requirements, and scheduling constraints.
Coordination of multiple shipments, delivery sequencing, and contingency planning for project-based logistics.
"Construction margins are thin. Every dollar saved on freight goes straight to the bottom line. Top City Freight helped us standardize costs across all our projects."
Get a free industry-specific analysis and see how much you could save.